SD-WAN and Security Refresh for 86 Branches of a Regional Bank
86 branches moved to SD-WAN; line cost fell 34% and branch activation dropped from 9 days to 1.
Istanbul - Ankara

180 virtual machines are replicated to a DR centre in Ankara; the annual live DR drill completes in three hours.
An insurance company had to document business continuity and disaster recovery tests as required by regulatory audit. Its existing backup system could not provide a documented, tested recovery time.
Systems were split into three tiers through a business impact analysis. Replication to a DR centre in Ankara was set up for the 180 critical virtual machines, and network, security and identity services were kept ready at the DR site. With routing automation, failover can be done with one click.
Under a three-year operations contract, two drills a year and quarterly restore testing continue.
86 branches moved to SD-WAN; line cost fell 34% and branch activation dropped from 9 days to 1.
An infrastructure connecting five hospitals to a single data centre and DR site, hosting a 600 TB imaging…
Production lines at three plants were separated from the office network, reducing ransomware risk while OEE…
In a free 60-minute discovery meeting we listen to your current setup and share the risks and our top three recommendations in a written report.